Kingstone retaining wall construction: Retaining wall drainage is an incredibly important part of building a stone wall. Once a few rows have been stacked, backfill the wall with rock so it matches the grade height in front of the wall, and then lay down perforated drain tile on top of the rock. Install drain tee fittings and a drain grate every 25 feet to 50 feet, depending on how much rainwater is expected to run down to the wall. Cut one block down to accommodate the drain grate. Screw the drain tile parts together so they won’t come apart when they get covered with more rock. Also, drain the tile to daylight at the ends of the walls whenever possible.
If the block Retaining wall is more substantial as in a metre high or more then the fence would have to be behind the wall instead of through or on top. Most Segmental Retaining Wall blocks do not have a big enough cavity or void for the fence post to be directly concreted inside them and would lack the strength to hold the weight of a fence. Generally, most walls are built using an aggregate (Gravel) backfill or in some circumstances No Fines Concrete (NFC). Because of this, an allowance has to be made for the fence post at the early construction stage such as installing PVC Piping as a sleave for the fence post to fit into, this would require some forethought and good planning.
We also repair existing retaining walls. Many railroad tie walls or older concrete retaining walls which may or may not include rocks or boulders are beginning to show signs of failure. Often times a homeowner will build a DIY retaining wall that needs help after years of service. We serve all of Colorado out of our home office in Colorado Springs. Please feel free to reach out to us with any questions you may have. Estimates are always free and everything we touch comes with a warranty. See even more details on Best Retaining Walls Colorado.
Other systems offer different interlocking features. Some blocks have a cast tongue-and-groove connection. Some systems utilize fiberglass pins that insert between the blocks to ensure proper alignment and a strong mechanical connection between the courses. Some blocks feature a hollow core, which, when filled with gravel, creates a semi-solid, interlocking web of rock throughout the wall. And many systems require reinforcing mesh layered between the courses of block.
DO start with a good foundation. Your retaining wall will only be as strong its support system. For a stacked-block retaining wall that’s no higher than four feet, a trench filled with three inches of crushed rock will help keep the wall from shifting and settling. The exact depth of the trench depends on the proposed height of the wall, but follow this rule of thumb: Dig a trench to be an eighth of the wall plus three inches. For example, if you want the finished height of your retaining wall to be three feet (36 inches) tall, you’d need to dig the trench eight inches deep to accommodate three inches of crushed rock and about five inches (or an eighth of the visible retaining wall) to start the wall below grade.